Summer House electrics

So here’s the back level of the garden finally levelled out:

Next job is to cover this with membrane and then a lot of gravel (not looking forward to borrowing all that up the hill!!). Eventually there will be a Summer House/Workshop type building on this space. However before I can cover the ground I need to run the electrics in. So that involves some work in this corner:

In order to comply with current building regs garden electrics need to be buried quite deep in the ground. Hence this trench:

Having lined the bottom of the trench with pea shingle to help drainage it’s then time to run the conduit and armoured cables in the trench:

More pea shingle secures and protects the electrics:

Extra protection is provided by old paving slabs on top of the shingle:

Finally some warning tape goes on top of the slabs to warn any future diggers:

I now need to fill in the final trench with some earth and some more warning tape just below the surface. It’s a lot of work these days running garden cables!!