Conservatory Stripped Bare

Time for a bit more demolition. Everything inside the ‘conservatory’ and kitchen area has been removed.

Towards the back of this area the outside ground level is about 2 feet above the internal floor level and nothing was done in construction to prevent damp. Therefore we had some truly minging mould etc when removing cabinets and lifting the carpet.

With everything removed a reasonable floor slab was revealed – it’ll have to go though as the floor level is not right.

A view back into what was once the ‘wet room’.

Tags: , , , ,

Leave a comment